NOTES TO THE SCHEDULE · SURFACES
The tiles themselves are rarely what sets the timeline. Inspection, preparation, levelling, waterproofing and the curing time between each step decide how long a bathroom, floor or splashback really takes. This guide goes through each stage in order and explains what can make it run longer.
SUBSTRATE · MEMBRANE · FINISH
Reference photo: wall tile set into ridged adhesive, the stage most people picture as the whole job
§ 01
A tiling job is a sequence. Most stages can’t start until the one before has dried, cured or set, and that waiting time is built into every honest timeline. Product instructions, room conditions and the size of the area all affect how long each pause lasts.
01 · INSPECTION
We check the substrate, any existing tiles, signs of moisture and how easy the area is to get to. If we find drummy tiles, cracking or a failed membrane, the scope changes before work starts, which beats finding out halfway through.
02 · PREPARATION
Stripping old tiles and adhesive from an existing bathroom takes far longer than priming a clean new wall. Damaged sheeting or render found underneath has to be fixed before anything else goes on.
03 · LEVELLING
Screeds and levelling compounds have to dry before any tile goes down. Larger tiles need a flatter surface, so large format tiling and many floor tiling jobs spend more time at this stage.
04 · WATERPROOFING AND CURING
In showers, bathrooms and laundries, the membrane goes on in coats, and each coat has to cure as the manufacturer directs. Cold or humid weather slows this down. Wet area waterproofing is where cutting time costs the most later.
05 · LAYING
Setting out comes before the first tile goes down. Niches, tapware, floor wastes, mitred corners and patterned layouts all add cutting time. Small mosaics and herringbone take longer per square metre than plain rectangles.
06 · GROUTING
Grouting too early can shift tiles or cause the grout to fail, so it waits until the adhesive has set. Narrow joints and specialty grouts take more care to fill and clean.
07 · SEALING
Movement joints at corners, benches and baths get silicone, and sealer goes on where the tile or grout needs it. A shower or floor should only go back into use once these have cured.
§ 02
WET AREAS
Removing old tiles, repairing the walls, membrane cure times, forming falls to the waste, and coordinating with plumbing all add up. See bathroom tiling for how we sequence this work.
SURFACES
Uneven slabs, timber subfloors, rooms that stay in use and complex layouts all add time. Splashbacks go faster on clean, flat walls but slow down around power points and windows. Read more about floor tiling.
OUTDOORS & REPAIR
Weather controls when outdoor membranes and adhesives can go down. With repairs, the time goes into tracking down the cause and matching the existing tiles. See balcony tiling and tile repairs.
Reference photo: a tiled shower base falling to a square drain, the result of several cured layers
A few decisions made early keep a tiling project moving:
Choose and order tiles before preparation starts, so curing time isn’t spent waiting on stock.
Confirm tapware, niche and waste positions before the membrane goes on.
Plan for another bathroom, or for the room being out of use, through the waterproofing cure.
Allow for what the inspection might find under old tiles.
For a timeline that suits your room in Oakleigh or the south-eastern suburbs, request a quote or ask a question through our contact page.