SCHEDULE ENTRY § 01 · WET AREAS
Wall and floor tiling for bathrooms, ensuites and powder rooms across Oakleigh and Melbourne’s south-eastern suburbs. Every job is planned around the falls, the fixtures and the lines you’ll look at every morning.
Reference photograph: a walk-in shower with stone-effect tiles carried from wall to floor around a square drain.
ROOMS
Main bathrooms, ensuites and powder rooms in homes and small commercial premises.
SURFACES
Shower walls and bases, full-height or part-height walls, and bathroom floors.
FINISH
Niches, external corners, edge trims, grout and sealed movement joints.
§ 01
Bathroom tiling is the most exacting tiling in a house. The floor has to fall to the waste and the walls have to stay plumb around the shower. Every cut also lands somewhere you can see it: beside the vanity, around the mixer and at the top of the niche. We plan the layout before a single tile is fixed, so joints run through from floor to wall and thin slivers stay out of sight.
The tiles sit on top of the wet area waterproofing, so we plan the tiling and the membrane together instead of treating them as two unrelated jobs. If your bathroom is being stripped back to the frame, our bathroom renovation tiling page explains where tiling fits in the wider sequence.
Water goes where it should. Floors are set to fall toward the waste, so the shower drains instead of pooling.
Lines that read cleanly. Grout joints line up across walls and floor, with balanced cuts at the corners.
Fewer weak points. Wherever a wall meets another surface, we use flexible sealant, because rigid grout tends to crack there.
A surface that’s easy to keep clean. We use grout suited to a wet room and finish edges with no sharp or chipped tile faces.
Most tiling faults start underneath the tile. These are the stages we work through before and during laying. Our article How Long Does Tiling Take? explains why none of them can be rushed.
01
We check the walls for plumb and the floor for level and falls. High spots are taken down and low spots are built up.
02
The waterproofing goes on first and is left to cure before any adhesive touches it.
03
We mark reference lines and plan the cuts around the waste, niche, mixer and vanity before fixing starts.
04
Each tile is fully bedded in adhesive and then grouted. Corners and junctions are finished with flexible sealant.
FINISHING DETAILS
These are the places where a bathroom is judged up close. We decide each one at set-out instead of working it out on the day.
Sized to the tile so the joints run through the recess. The base slopes slightly so water doesn’t sit.
Finished with trims or mitred tile edges, depending on the tile and the look you want.
This is where a room moves most, so we seal it with flexible sealant instead of grout.
Mosaic strips and feature walls line up with the main tile grid, so they look planned rather than added later.
Reference photograph: a vertical mosaic feature set within marble-effect tiles.
The size of the room, the tile format, how much preparation the walls and floor need, and extras such as niches and feature walls. Bathroom Tiling Costs Explained walks through each factor.
It depends on the size of the room and how long screeds, membranes and adhesives take to cure. When we look at your bathroom, we explain the likely sequence for that job.
Sometimes on dry walls, but rarely in a shower. Loose or drummy tiles, failed waterproofing or a change in floor height usually mean stripping back to the substrate.
Often not. If the tiles are sound and nothing is leaking, regrouting can restore the surface.
RELATED SERVICES
FURTHER READING
Tell us about the room and the tiles you have in mind. For general questions, use the contact page.